40 tonne of steel detailed, fabricated, painted and installed inside a heritage building.
Site constraints for this project included machinery access, loading on floors and protection of heritage items.
40 tonne of steel detailed, fabricated, painted and installed inside a heritage building.
Site constraints for this project included machinery access, loading on floors and protection of heritage items.